Browsing floor plans is enjoyable and it is the wrong place to start. Your setbacks, lot coverage limit and height limit define the envelope any plan has to fit inside. This page shows what genuinely fits at each square footage, and the fee threshold that can make a slightly smaller unit substantially cheaper.
Detached ADUs in California can be built up to 1,200 square feet on most residential lots, regardless of the primary home's size.
The International Residential Code (IRC) Appendix BC mandates that an ADU must be at least 190 square feet and contain no more than two bedrooms.
California law (AB 881) restricts local governments from requiring side and rear setbacks greater than 4 feet for detached ADUs.
ADU floor plans under 750 square feet are exempt from development impact fees in California.
Under California SB 543 (effective 2026), ADUs and JADUs with 500 or fewer square feet of interior livable space are exempt from school impact fees.
Figures below are researched market numbers for budgeting and comparison. They are not quotes. Final pricing depends on your site, your jurisdiction, finish selections, foundation and utility distance.
ADU rules are set locally and change often. These are the provisions that most commonly control the outcome. Verify against your own jurisdiction before you design anything.
Floor plan browsing is enjoyable and it is the wrong place to start. Start with your setbacks, your lot coverage limit and your height limit, because those three numbers define the envelope any plan has to fit inside. A beautiful 900 square foot plan is worthless if your rear setback leaves you 24 feet of buildable depth.
Below roughly 400 square feet you are designing a studio, and the design problem is storage and the bathroom door swing. Between 400 and 600 a genuine one-bedroom becomes possible with a real kitchen. Between 600 and 800 you get a comfortable one-bedroom or a tight two-bedroom, and this range is where most jurisdictions stop requiring additional parking or discretionary review. Above 800 the two-bedroom works properly, but you may cross thresholds that trigger impact fees which were waived below.
That fee threshold is worth understanding before you fall in love with a layout. Several jurisdictions waive impact fees entirely below a defined square footage and assess them above it, which means the marginal cost of the square foot that crosses the line can be thousands of dollars rather than the few hundred that the construction itself costs.
| Under 400 sq ft | Studio. One bath. Storage is the design challenge. |
| 400 to 500 sq ft | One bedroom with a full kitchen becomes workable. |
| 500 to 600 sq ft | Comfortable one bedroom, separate living area. |
| 600 to 800 sq ft | Generous one bedroom or a tight two bedroom. |
| 800 to 1,000 sq ft | Two bedroom, one or two baths. May cross fee thresholds. |
| 1,000 to 1,200 sq ft | Two to three bedroom. Often at or near maximum allowed size. |
| Buildable envelope | Setbacks and coverage limit, not plan preference, decide what fits. |
| Height limit | Determines whether a second story is even available to you. |
Most pages on this subject put the cost behind a contact form. The reasoning is understandable and the result is that you cannot budget, cannot compare, and cannot tell whether a bid is reasonable until you have already given up your phone number to three companies.
We publish the figures instead. They are researched market ranges rather than quotes, and site conditions will move them more than any other factor, but a range you can plan against beats a call-back you have to wait for. The constraints that decide feasibility — setbacks, height, utility distance, site access — are stated up front for the same reason. If your project is not viable, that is worth knowing on the first visit rather than the third phone call.
Factory production windows move with queue depth, material lead times and seasonal demand. We quote the current window rather than a fixed promise, because anyone promising a specific delivery date months out without seeing the factory schedule is guessing. Permitting is usually the longer pole: in ministerial states the review clock is defined by statute, while in discretionary jurisdictions it can run considerably longer.
The sequence that controls your schedule is site plan, permit submittal, plan check and corrections, permit issuance, factory slot, delivery and set, then utility connection and final inspection. Factory build time overlaps permitting only if you commit to the slot before permits are issued, which carries its own risk.
Tell us the scope and the ZIP. You get a real delivered-and-installed number, not a "contact us for pricing" runaround.